24/7 Emergency Service | Cullison Excavating, LLC
Road Work Services
At Cullison, we pave the way for development. We are your reliable partners in all your road work needs, be it minor repairs or mega construction projects of roads. When this is combined with professional skill and top-of-the-range equipment to ensure it, you have a team that gives the most efficient and high-quality service toward the road project at hand.
Free Estimate
Share your details for a personalized estimate. We will respond within 24 hours.
"*" indicates required fields
Why Choose Cullison Excavating, LLC for Your Road Work Project?
30+
Years of Experience
60+
Five-Star Reviews
Experienced Professionals
We have experience in dealing with a wide range of roadwork. Our professional team is qualified and technically knowledgeable about all aspects of roads.
Safety Focus
We maintain the safety of any project we enlist in. We observe the highest level of safety codes and institute competent and comprehensive safety measures to ensure the protection of our workers.
Quality Workmanship
We are proud of our finished product, which boasts quality results. We use only the best materials and exercise meticulous construction practices for long-lasting, capable roads.
Communication is Key
We value the power of communication. We will keep you updated on the project, and if you have any questions or concerns, please bring them out openly.
On-Time and On-Budget
We work very hard to be on time and on budget when completing your projects. In simpler terms, our smart project planning and management have greatly helped us reduce procrastination and hidden costs.
Our Road Work Services

Road Construction
We carry out new works, starting with subgrade preparation and progressing to base materials laying, and striping.

Road Rehabilitation
It might be time for your present road to have a facelift. Cullison Excavating provides all the services for road and pavement rehabilitation, like patching, crack sealing, and pothole repair.

Excavation and Drainage
Our company takes care of utility, provisioning, and installation processes, including improving drainage and constructing sidewalks.

Curb and Gutter Installation
Curbs and gutters also play a big role in road safety and drainage. We either install brand-new ones or make the necessary repairs to ensure proper water flow.

Pavement Maintenance
With Cullion Excavating's pavement maintenance services, you can sit back and relax. We take care of your sidewalks and pavements, cleaning them, clearing them, and enhancing their appearance and life.

Traffic Control and Signage
We believe that traffic flow is significant. We shall properly implement a traffic management scheme and install the required signs to ensure safety and reduce interruption.
Need Immediate Assistance?
Contact Us Now for 24/7 Emergency Services!
Other Service Considerations

Permits and Approvals
We assist in obtaining the requisite permits and approvals from the local jurisdictions where your road project will be located.

Project Planning and Design
Engage engineers and designers for complex road work projects in detailed project planning and design tailored to your needs.
From Start to Finish, We’ve Got You Covered
Need Immediate Assistance?
Contact Us Now for 24/7 Emergency Services!
I knew virtually nothing about septic systems and was under the impression that if it’s not causing a problem, it’s good. During a discussion with friends, I learned I should have had it pumped out every 3-5 years!! I filled...
Read MoreNeeded septic pumped. Called and spoke to a very nice lady. Spoke about availability and settled on next day service. Cowboy showed up early morning. Once the septic was pumped, Cowboy advised us of tree root penetration in tank and...
Read MoreThe work was done beyond expectations. The person I want to thank is Jessica! She made this so easy and convenient. She is diligent, comprehensive, knowledgeable, and wonderful to work with! She made the entire experience a breeze!!!...
Read MoreProfessional, polite, patient, informative!...
Read MoreFolks in the main office explained soil getting wet and why they had to check (dryness) before delivering bulk materials. Andrew the driver, drove around underground hazards (septic tank) and delivered the materials exactly where needed. Great service....
Read MoreThe technician came out to care for our septic system and was terrific! He inspected the system and explained everything we need to be doing to keep the system healthy and running. Prices are very reasonable. Recommend Cullison highly....
Read MoreContact Us today
Cullison Excavating, LLC has been providing exceptional road work services and remains committed to a quality job with safety. With training, quality, and safety involvement, it's quite easy to help on the path toward success for your road project. Contact us today and talk to us about the road issues. Let's pave the way toward a smooth and safe future.
PHONE
ADDRESS
24380 Hollywood Rd
Hollywood, MD 20636
Free Estimate
Share your details for a personalized estimate. We will respond within 24 hours.
"*" indicates required fields

